September, 2000
September 3rd
Forward Canard Attach Point
2
Bleeding Brake System
Overhead Duct 2
September 4th
Closing Sump Tank
Fuel Tank Mesh
Overhead Duct 3
September 9th
Sealing Sump Tank
Smoothing Nose
September 10th
Front Seat Back Attachment
Front Seat Attach Points
Front Seat Frame Attachment
September 12th
Reserving an N-Number
September 16th
Co-pilot Side Seat Frame Installation
Fuel Filler Gounding
September 17th
Elevator Trim Actuator Mount
Rear Seat 1
September 23rd
Elevator Trim Actuator Installation
Master Relay Hard Points
Forward Power Bus
September 24th
Master Relay Installation
Sanding the Nose
Rear Seats 2
September 27th
Electrical Wiring 1
Rear Seat Spacers
Rudder Pedal Return Spring
September 30th.
Rear Seat Support
Instrument Panel Ground Bus